electED.

PRESIDENTIAL PERMIT: AUTHORIZING BRIDGER PIPELINE EXPANSION LLCTO CONSTRUCT, CONNECT, OPERATE, AND MAINTAIN PIPELINE FACILITIES AT THE INTERNATIONAL BOUNDARY AT PHILLIPS COUNTY, MONTANA, BETWEEN THE UNITED STATES AND CANADA

Memorandum published 2026-04-30. By virtue of the authority vested in me as President of the United States of America (the “President”), I hereby grant this…

Type
Memorandum
Published
2026-04-30

Record overview

By virtue of the authority vested in me as President of the United States of America (the “President”), I hereby grant this Presidential permit, subject to the conditions herein set forth to Bridger Pipeline Expansion LLC (the “permittee”). The permittee is a privately held limited liability company organized under the laws of the State of Wyoming and a wholly owned subsidiary of Bridger Pipeline LLC. Permission is hereby granted to the permittee to construct, connect, operate, and maintain pipeline Border facilities, as described herein, at the international border of the United States and Canada in Phillips County, Montana, for the transport between the United States and Canada of crude oil and petroleum products of every description,…

Source-grounded overview; consult the original document for full provisions and qualifications.

Sources